Bright Minds Solar
  • Why?
  • How?
  • What?

Author: brightminds

Naz_Array_small

Bright Minds Solar Completes First Two Projects

Posted on July 12, 2018July 12, 2018 by brightminds

The first system to go online is the 76.2kW array on top of the 1st Church of the Nazarene in Long Beach. That was followed shortly by a 100kW system on the Shoreline Church in San Clemente. These two facilities are now operating on local, clean energy, with a combined savings of approximately 200 tons[…]

human brain on white background

Bright Minds Solar Breaks Ground on First Project

Posted on February 15, 2018February 15, 2018 by brightminds

Bright Minds Solar is underway on its first two solar installations. We are very happy to be working with the Shoreline Church in San Clemente, and the First Church of the Nazarene in Long Beach, CA. Shoreline, who was the first to sign a contract with Bright Minds Solar for financing and installation, is currently[…]

Posts navigation

Recent Posts

  • Bright Minds Solar Completes First Two Projects
  • Bright Minds Solar Breaks Ground on First Project

Recent Comments

    Archives

    • July 2018
    • February 2018

    Categories

    • Uncategorized

    Meta

    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    Laguna Beach, CA
    info@brightmindssolar.org
    949-280-1111
    A nonprofit powered by the sun!