Bright Minds Solar Completes First Two Projects
The first system to go online is the 76.2kW array on top of the 1st Church of the Nazarene in Long Beach. That was followed shortly by a 100kW system on the Shoreline Church in San Clemente. These two facilities are now operating on local, clean energy, with a combined savings of approximately 200 tons[…]